Harrold & Kite Pty Ltd were engaged as the head contractor for the refurbishment of the Sportsmed clinic and hospital.
The project consisted of twelve stages, spanning across two buildings and multiple floors. All works were completed while both the hospital and clinic remained open which created many scheduling and operational challenges that were overcome through great teamwork, creative problem solving and skillful execution.
The ground and first floors to the main facility were demolished in stages and completely overhauled. This included all new treatment and waiting rooms to podiatry, physio and orthopedic areas.
The hospital reception and waiting rooms were completely revamped to better suit the needs of the business. A new reception area, including offices, was constructed and the waiting room received new inbuilt and loose furniture.
The facility also received a major upgrade to their gymnasium which was increased in size by over double. As part of the upgrade a new pilates studio was constructed as well as a new gait lab.
Harrold & Kite Pty Ltd were selected as the preferred building contractor by Catholic Education South Australia (CESA) for the Construction of their new 2-storey general teaching building at St Martins School, Greenacres.
The new Building is located to the north-west of the school site, replacing existing transportable classrooms. The new building provided the school an opportunity to create a junior primary precinct, consisting of 12 flexible learning spaces, teaching prep & common areas as well as staff amenities. Alterations and refurbishment work was also undertaken in the adjacent Sweeney Building along with significant landscape works to create creative play areas.
For the duration of the project the School remained in full occupation and the outstanding collaborative approach of our delivery team with the School Principal, Staff & Design team was paramount in the successful delivery of this project.
The construction was completed on schedule despite early inclement weather & unforeseen soil conditions causing lengthy delays. Our teams commitment and attention to detail resulted in outstanding accolades offered by CESA’s Project Manager and the Principal Architect for the extreme high quality of workmanship delivered throughout the build.
Harrold & Kite Pty Ltd were appointed as the Managing Contractor to undertake alterations and additions to the existing 60 Bed nursing home at Clayton Church Homes – Park Village, Elizabeth. The primary work consisted of an upgrade to the administration area, fire protection; including hydrant and sprinklers and linking all houses with fully enclosed corridors and linkways. In addition, 40 bedrooms and ensuites together with common areas and nurses’ stations were refurbished.
Undertaking construction within a fully occupied and working nursing home was a challenge. Consulting with the CCH staff, Harrold & Kite planned and coordinated the many stages undertaken. The safety and well being of the residents, staff and workers was paramount. Temporary rooms were built so that residents could temporarily be relocated whilst their area was being upgraded. The project also included work being undertaken in the 20 room Secure memory support unit, and this was executed without incident and limited disruption to the residents.
In addition, Harrold & Kite worked with CCH, and the project designers to undertake a kitchen, laundry, landscaping and paving upgrade, including working within a large fully enclosed courtyard. Again, complex staging and attention to safety ensured that all the residents, staff and workers were not compromised in any way
Upon completion CCH and Harrold & Kite are delighted that the upgrade works has totally revitalised and transformed the facility into a modern home for the residents.
Harrold & Kite Pty Ltd were engaged as the Main Building Contractor for the fit out of a new dental facility located in the Northgate Shopping Centre.
Creating spaces that felt open and spacious rather than closed in and constricted was an absolute must, but presented as a challenge due to the small tenancy. Close consultation and continuous communication with the design team enabled Harrold & Kite to deliver a spacious facility comprising of three clinics, a sterilisation room, an OPG x-ray room along with the waiting and reception area.
With timeframe and budget being of great importance to the Client, ongoing value management throughout the pre-construction and construction phase enabled Harrold & Kite the ability to deliver the project within budget and to a high standard of finish using quality materials.
Renovating this much loved country family home into a contemporary residence for our Client was challenging but incredibly rewarding.
It was paramount that the existing locally sourced sand stone facade was maintained and complimented by the rendered brick veneer extension, ensuring the original character and charm of the home was still portrayed.
A lot of thought and careful design was put into the large open planned kitchen, with charming country features such as the oven, tiled splashback and timber benchtop. Most impressive though, is the striking Blackbutt timber ceiling that flows through to the outdoor dining area, providing a seamless junction between inside and out, whilst the new pool is neatly landscaped into the environment, again using Blackbutt decking to tie it into the house.
The two new bathrooms, cellar, a double garage and gym finish the renovation to a very high standard with modern design and details that compliment the existing country abode and leave a lasting impression.
Harrold and Kite were selected as the Head Building Contractor for the new Art Science facility at Walford Anglican School for Girls.
Our immediate challenge was to deliver a state of the art science facility to a high architectural finish in an extremely challenging timeframe.
Extensive pre-construction planning and co-ordination of critical trade contractors enabled us to deliver an exceptionally high quality result that met the very highest expectations of the Client and Architect.
The project comprised a complete renovation and renewal of five laboratory spaces, the associated preparatory and storage spaces, as well as general learning areas and meeting room. Close co-ordination of services and finishing trades was required to discretely conceal the extensive new services fundamental to the architectural design and client requirements.
An excellent example of combining industrial finishes with contrasting high end finishes which has created uniquely functional and beautiful spaces. The results were met with great accolades from teaching staff, students and the wider school community.
Harrold & Kite Pty Ltd were engaged as the head contractor by DPTI to undertake the refurbishment of the Main Library and Multipurpose teaching areas.
The School remained in full occupation throughout the refurbishment with temporary library and teaching facilities provided while safely maintaining staff student movement though the course of construction.
The works involved the complete internal demolition of all walls and ceilings inclusive of existing services to create new open spaces. Both exposed and decorative ceilings were provided and acoustic performance treatments at floor and ceiling level introduced to all spaces. New joinery and furniture were provided throughout all collaborative teaching areas.
Harrold & Kite Pty Ltd were engaged as the head contractor to construct the Willow Close Children’s Centre.
The works comprised of a single main facility split into three areas with the ability for each area to operate independently. These were a main learning space, special needs learning space and a community hall which is available for use by local community groups.
Decorative plywood ceilings throughout the main learning space provide high levels of acoustic performance and the clerestory windows fill the rooms with plenty of natural light.
Extensive landscaping surrounds the facility and creates an inviting play space for the children. Trees removed during construction were reused in the landscaping to compliment the outdoor play facilities by creating natural play areas.
Harrold & Kite Pty Ltd were selected as head Building contractor by DPTI for the Banksia Park International High School STEM Upgrade project.
The project consisted of three stages and spanned across five buildings creating logistics & scheduling challenges that were overcome with careful planning and continuous communication with the client.
The works comprised of new open plan learning areas, maker spaces complete with photography studios and 3D printing suites and new offices and staff rooms.
The gymnasium changerooms were reconfigured and completely overhauled with all new finishes and fixtures with part of the space being converted into new maker spaces complete with a sports floor. A mezzanine level was renovated and is now finished with a glass balustrade and tiered seating overlooking the gym for spectating sports.
Harrold & Kite Pty Ltd were appointed as Managing Contractors to carry out the construction of a new 16 bed residence, along with alterations and additions to the existing Aged Care Facility for Resthaven at Westbourne Park.
The project highlighted Harrold & Kite’s ability to work within a client occupied site throughout the entire construction process. Careful staging and planning considering the site logistic at all times were required in particular within the internal refurbished areas as the client required all residents remained in full occupation.
Harrold & Kite ensured the staff and residence were exposed to minimal disruption throughout construction, collaborated and worked closely with the Resthaven site management to ensure the daily operations of the Nursing home were maintained.
Great skill and co-operation was demonstrated by Harrold & Kite with their ability to identify and rectify potential issues that may have risen as quickly as possible, adapting proactively to scope and design changes ensuring all items were addressed in a timely fashion to the clients utmost satisfaction.
Special mention was made of the quality of workmanship delivered by Harrold & Kite and our selected trades, exceeding the client’s expectations.